2021 Engineering Excellence Awards Submissions for Judges

Instructions for Judging

Hello Judges and thank you for agreeing to serve as a judge in this year's competition - on behalf of our Board of Directors, we are grateful for your time and expertise.
 
Please make sure and familiarize yourself with the Judging Criteria and its corresponding Judging Spreadsheet.
Your mission is relatively straightforward:  Please download the Judging Spreadsheet and place your name at the top.  Save this locally to your computer until you are ready to submit all your scores into our office at info@acecmw.org.  Please click on each project and open the corresponding file so that you can make your review.  Once you have scored the project, close it out and move on to the next one.  This is meant to be done at your own pace, so if you get into a groove and knock them all out at once, please feel free to submit your scores when you are done.
 
We ask that you get your spreadsheet back into us by October 19th at the very latest.  Sooner is fine with us.
 
If at any time you have questions, please feel free to send a note and we can direct you accordingly.  For those projects you might have knowledge of, please simply recuse yourself so that your scores will not be included in our judges scoring tally.
 
Once you have submitted your scores and we tabulate them, we will share with you the list of winners.  Note that the Grand Award(s) will not be made public until the night of the gala, which will be on December 8, 2021 at the Sheraton Pentagon City.
 
Thanks again for your time, and have at it!
+ Mac 
Hugh "Mac" Cannon, MPA, CAE
ACEC/MW President

 

Criteria

Max. Assigned Score is out of 20

1. Uniqueness and/or Innovative Application of New or Existing Techniques
  • Does the entry demonstrate the use of a new science or a breakthrough in the general knowledge of engineering?
  • Does the entry represent a unique application of new or existing technology, techniques, materials or equipment?

2. Future Value to the Engineering Profession and Perception by the Public
  • Will the entry redefine current engineering thinking?
  • Advance a positive public image of engineering excellence?

3. Social, Economic and Sustainable Development Considerations
  • Do the solutions identified produce secondary benefits of value to the community environment?
  • Does the entrant’s approach provide society with social, economic, or sustainable development benefits?
  • Does the entrant’s contribution to the project improve the health, safety or welfare of the public or affected environment?

4. Complexity
  • Did the entrant successfully address highly complex criteria or unique problems?
  • Were extraordinary problems of site, location, hazardous conditions, project requirements, or similar elements present?
  • Did the entry require the use of out-of-the-ordinary technology or ingenuity for achievement of the project’s goals?

5. Successful Fulfilment of Client/Owner Needs
  • Did the engineer or entrant successfully engage the client/owner in the overall project development process?
  • Was it an economical and cost-effective solution?
  • How did the final cost relate to the original budget estimate?
  • How closely does the entrant’s solution meet the total goals of the client/owner?
  • Did the entrant meet the client’s time schedule?
 

Judging Spreadsheet

Due October 19, 2021 - send to info@acecmw.org
 

Submissions

Firm: AECOM
Project: Rehabilitation of Arlington Memorial Bridge
Category: Design
Complete File


Firm: A. Morton Thomas
Project: Minnesota Ave, NE
Category: Design
Complete File


Firm: CMTA
Project: Lubber Run Community Center
Category: Design
Complete File


Firm: Delon Hampton & Assoc.
Project: Marriott Residence Inn Baltimore
Category: Design
Complete File


Firm: EBA Engineering
Project:  I-83 Bridge
Category: Design
Complete File


Firm: EBA Engineering
Project: Metropolitan Branch Trail
Category: Non-design
Complete File


Firm: EXP
Project: Parkside Pedestrian Bridge
Category: Non-design
Complete File


Firm: JMT
Project: Aspen Hill Neighborhood Greenway
Category: Design
Complete File


Firm: JMT
Project: Black Lives Matter Plaza
Category: Design
Complete File


Firm: Kimley-Horn
Project: Columbia Pike Multimodal Street Improvements
Category: Design
Complete File


Firm: M.C. Dean
Project: WMATA LED Platform Lighting Replacement
Category: Design
Complete File


Firm: Mead & Hunt / JMT Joint Submission
Project: Crosstown Cycle Track
Category: Design
Complete File


Firm: Parsons
Project: Route 7 and Battlefield Parkway Interchange
Category: Design
Complete File


Firm: Precision Systems, Inc.
Project: Citywide Bus Priority Initiative
Category: Design
Complete File


Firm: RK&K
Project: Rock Creek East One Livability Study
Category: Non-design
Complete File


Firm: Setty & Associates / Cube Root Corp
Project: EDCPS Epidemic Preparedness HVAC Upgrades
Category: Design
Complete File

Firm: Sheladia
Project: Long Branch Library Refreshment Project
Category: Design
Complete File


Firm: Stantec
Project: Edmondson Avenue Bridge
Category: Design
Complete File


Firm: Stantec
Project: Frederick Road Bike Path
Category: Design
Complete File


Firm: Stantec
Project: Sunnyside Avenue Bridge
Category: Design
Complete File


Firm: Straughan Environmental
Project: Branch Avenue Park 
Category: Design
Complete File


Firm: Straughan Environmental
Project: Buried Streams
Category: Non-design
Complete File


Firm: Straughan Environmental
Project: Cedar Haven Living Shorelines
Category: Design
Complete File


Firm: Volkert
Project: Hillsboro
Category: Design
Complete File


Firm: Volkert
Project: Waterloo Bridge
Category: Design
Complete File


Firm: Whitman, Requardt & Assoc. (WRA)
Project: Blandair Regional Park
Category: Design
Complete File


Firm: Whitman, Requardt & Assoc. (WRA)
Project: Cumberland
Category: Design
Complete File


Firm: Whitman, Requardt & Assoc. (WRA)
Project: MD 32 Design-Build
Category: Design
Complete File


Firm: WSP
Project: Chestnut Street Sidewalk Improvements
Category: 
Complete File


Firm: WSP
Project: WMATA Metrorail Management Reorganization
Category: 
Complete File